Skip to content

Hi-Tech Industrial Park, Jinan, Shandong Province, China

SEASONAL OPERATION

Agricultural machine parts

Hinged parts and bushings for mechanisms with a seasonal operating program.

View products
Seasonpeak demand
Storagesurface protection
Serviceeasy identification

SEASONAL OPERATION

Seasonality affects preparation times and packaging

The hinged parts of agricultural machines can be stored for a long time and then used during an intensive season. Therefore, geometry and material requirements are added to surface protection, marking and batch planning.

Seasonality affects preparation times and packaging

WHAT TO CHECK

What to clarify for the seasonal program

Technical and logistic data are considered together.

01

Mechanism

The position of the part and the nature of the movement.

02

Wednesday

Dust, moisture, fertilizers and cleaning.

03

Storage

Duration, anti-corrosion protection and packaging.

04

Schedule

Pre-season demand and reserve.

HOW THE WORK IS CONSTRUCTED

Preparing the batch before the peak load period

After confirming the sample, you can agree on production and packaging by equipment groups or repair kits.

01

Plan

Nomenclature and period of requirement.

02

Party

Manufacturing and control.

03

Storage

Protection, label and packaging.

RESULT

Parts ready for warehouse storage and distribution

The packaging format is determined by the order and does not replace the preservation requirements of a specific material or coating.

  • ProtectionAgreed method.
  • LabelNumber and quantity.
  • SetEquipment for the car.
Transfer source data

BEFORE AGREEMENT

Checking a part for seasonal use

The seasonal cycle affects downtime, storage and maintenance schedules. For bushings and pins, the operating mechanism, contamination, lubrication frequency and required repeatability of spare lots are specified. Dimensions and materials are confirmed from the drawing and are not transferred from parts of a similar machine.

01

Mechanism

Attachment, joint, rod or adjustable unit.

02

Cycle

Season length, downtime and maintenance between cycles.

03

Surface

Lubrication, corrosion protection and storage conditions.

04

Delivery

Trial batch, reserve and marking for replacement.

NEXT STEP

Prepare a seasonal parts list

Add terms, item numbers, reserve volume and storage conditions.

Send request