Skip to content

Hi-Tech Industrial Park, Jinan, Shandong Province, China

ENGINEERING SOLUTIONS

Solutions

Selection of part design and production route according to operating conditions.

View products
Knotload and interface
Detailmaterial and geometry
Partycontrol and delivery

ENGINEERING SOLUTIONS

Design does not start with a catalog size

The same outside dimensions do not mean the same bushing or pin performance. The position of the joint, the direction of the load, contamination, lubrication intervals and the condition of the mating parts create different requirements.

SENNAI links these input data to the workpiece, material, heat treatment, work surface and finished batch inspection.

Design does not start with a catalog size

WHAT TO CHECK

Four areas of engineering review

Each direction covers a separate group of risks before calculation and launch.

01

Bushing according to drawing

Geometry, wall, grooves, flange and control zones.

02

Pin-bushing pair

Fit, working clearance, hardness and compatibility of surfaces.

03

Lubrication system

Grooves, pockets, cells and holes taking into account movement.

04

OEM supply

Documentation version, sample, repeatability, marking and packaging.

HOW THE WORK IS CONSTRUCTED

How the original data turns into a route

After checking the task, the type of workpiece and the sequence of operations are selected. Machining allowances are associated with heat treatment and subsequent internal or external grinding.

01

Before calculation

Confirmed parameters are separated from preliminary ones.

02

Before sample

The material, work areas and control methods are recorded.

03

Before the series

Sampling, labeling and delivery set are agreed upon.

RESULT

Solution that can be verified against order documents

The result is not an abstract “reinforced part”, but a consistent composition: design, material, processing, verifiable characteristics and lot identification rules.

  • GeometryDimensions, tolerances and seating surfaces.
  • TechnologyPreparation, processing and finishing.
  • AcceptanceMethods, sampling and criteria.
Transfer source data

NEXT STEP

Describe the working unit and attach a drawing

Associated parts, lubrication mode, material, volume and inspection requirements are useful for initial inspection.

Send request