Skip to content

Hi-Tech Industrial Park, Jinan, Shandong Province, China

ENGINEERING CHECK

Engineering verification of initial data

Drawing, fit, material, heat treatment and control before calculation.

View products
Drawingbases and tolerances
DFMmanufacturing route
Controlmeasurable criteria

ENGINEERING CHECK

It is better to close technical issues before making an offer.

Checking the input data reveals inconsistencies between size, material, heat treatment and available technology. Open issues are recorded before settlement so that price and timing are not based on unknown assumptions.

It is better to close technical issues before making an offer.

WHAT TO CHECK

What does the engineer check?

Features that affect function and route are given priority.

01

Geometry

Bases, dimensional chains and processing availability.

02

Material

Compatible with required properties.

03

Process

Allowances, deformation and sequence of operations.

04

Acceptance

Controllability of special characteristics.

HOW THE WORK IS CONSTRUCTED

Questions turn into fixed solutions

The answers are included in the agreed drawing, table or technical application. The document version is used by production and acceptance.

Questions turn into fixed solutions

RESULT

Job suitable for production and control

The share of hidden assumptions is reduced, and the boundaries of responsibility become clearer to both parties.

  • DataConfirmed parameters.
  • ExceptionsOpen questions.
  • DocumentAgreed version.
Transfer source data

BEFORE AGREEMENT

Boundaries of engineering verification before calculation

Engineering verification links the part drawing with the interface and manufacturing sequence. At this stage, unknown parameters, critical dimensions and acceptance criteria are recorded. The test result does not replace the approved design documentation: changes in material, fit or heat treatment are agreed upon before the sample is launched.

01

Original version

Number and revision of the drawing, units of measurement and tolerances.

02

Work node

Mating parts, movement, load, contamination and lubrication.

03

Route

Preparation, allowances, processing, hardening and finishing.

04

Confirmation

Sample, measurement methods and control of serial batch.

NEXT STEP

Submit the drawing for initial DFM check

Note critical dimensions, material, processing and expected volume.

Send request